Full driveway pour from scratch. Our team graded the site, compacted base rock, set forms, and poured a 5-inch slab with a 3,000 PSI air-entrained mix. Proper slope for drainage away from the house, saw-cut control joints at 10-foot intervals, and a clean broom finish that looks sharp from the street.
Project details
What this job included.
- Full site grading and compacted base rock
- 5-inch slab with air-entrained 3,000 PSI mix
- Saw-cut control joints every 10 feet
- Proper drainage slope and clean broom finish