Front walkway upgrade in Tacoma. The old path was cracked and settling, so our team demoed it out, regraded the subbase, and poured a wider 4-inch slab with a clean broom finish. The new walkway runs straight from the sidewalk to the front door with proper control joints to manage cracking over time.
Project details
What this job included.
- Demo and haul-away of the old cracked walkway
- Subgrade compaction and base rock prep
- 4-inch concrete slab with broom finish for traction
- Control joints cut to prevent random cracking
Need similar work?
